Derry township ag fair8/28/2023 ![]() Upper McGee Run Reservoir was also constructed in 1888 at a cost of $12,704.00. The Lower McGee Run Reservoir was constructed in 1888 at a cost of $9,138.80. The capacity of the two McGee Run Reservoirs is 4,500,000 gallons. Water was turned into taps on March 31, 1888. There were 24 taps made and applications for an additional 31. On the Lower McGee Run Reservoir was completed and water was fed into the system. Also, during this period 21 fire hydrants and 20 stop valves were installed. Contracts for construction of the water dams, transmission mains and distribution system were awarded September 14, 1887.Ĭonstruction started on Octoand continued until Decemwhen cold weather set in. The Derry Water Company obtained its charter on May 4, 1887. The Hillside rights were later sold to Blairsville Borough to enhance their water supply for $10,000.00. ![]() McGee Run, Millwood Run and Hillside Run. They obtained the water rights to three streams within the Derry Area. These men saw a vision of a future Derry. The original Board of Directors and shareholders of the Derry Water Company. A Brief History of the Derry Water Companyĭerry Water Company Incorporated May 12, 1887.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |